← All Articles

Chinese New Year 2027 Production Calendar for Clothing Brands (2026): 40+ Dates and Data Points on Order Deadlines, Factory Shutdown and Restart

China’s official Spring Festival 2027 holiday is 9 days (Fri 5 to Sat 13 Feb), but Maersk says logistics ripple effects can last up to six weeks. The date is set by the State Council’s notice of 5 Nov 2026, and it is the anchor for every order deadline, factory shutdown and restart date a clothing brand needs this winter.

9 days

is China’s official Spring Festival 2027 holiday (Fri 5 to Sat 13 Feb), but Maersk says logistics ripple effects can last up to six weeks (State Council General Office of China; Maersk).

Lunar New Year Day is Sat 6 Feb 2027, and Sun 31 Jan and Sun 14 Feb are make-up working days (State Council, 5 Nov 2026). Factories typically cut output 2-3 weeks before the holiday, with full capacity not back until mid-March (Maersk). From 13 Nov 2026 there are 84 days left to the holiday start (our arithmetic).

We built this calendar from 40 data points, anchored on the State Council General Office’s 2027 holiday notice (issued 5 Nov 2026), the Hong Kong Observatory’s 2027 calendar table, Maersk’s Chinese New Year guidance, the National Bureau of Statistics of China’s migrant worker survey, and NewWay’s own factory lead times. Dated deadlines marked derived are our arithmetic from those sources, with the formula shown.

Every year small brands ask us the same question in November: can we still get this style made before the holiday? This year the answer is tighter than usual, because the holiday starts 11 days earlier than in 2026. Below we give the official dates, the slowdown window, and a dated checklist you can work backward from. We also say plainly where the data runs out. A shutdown calendar is only useful if you can tell which dates are published and which are our estimates.

Key Takeaways

  1. 5-13 Feb 2027: is the State Council’s official Spring Festival holiday, 9 days, Fri to Sat, issued 5 Nov 2026 (State Council General Office of China).
  2. Sat 6 Feb 2027: is Lunar New Year Day; the Eve is Fri 5 Feb (Hong Kong Observatory).
  3. Sun 31 Jan and Sun 14 Feb: are the make-up working days that bracket the holiday (State Council General Office of China).
  4. 15-23 Feb 2026: was last year’s holiday, also 9 days, with make-up days on Sat 14 Feb and Sat 28 Feb (State Council General Office of China).
  5. 2-3 weeks before the holiday: is when factory output is typically reduced, and it may not reach full capacity until mid-March (Maersk).
  6. Up to six weeks: is how long Maersk says logistics ripple effects can last (Maersk).
  7. Roughly 4-6 weeks: is the consensus industry range for total disruption, from slowdown to full recovery (Tier 3-consensus, a planning range, not a measured statistic) (SEKO Logistics).
  8. 301.15 million: migrant workers in China in 2025, up 1.42 million (+0.5%) year on year (National Bureau of Statistics of China).
  9. About 14 days: is NewWay’s sample lead time (NewWay Industrial Co., Ltd.).
  10. About 30 days: is NewWay’s bulk production time after PP sample confirmation (NewWay Industrial Co., Ltd.).

1. The Official 2027 Calendar: Dates You Can Plan Around

5-13 Feb 2027 is the State Council’s Spring Festival holiday block, issued on 5 Nov 2026, and every other date in this calendar hangs from it. Several guides still in circulation give 4-12 Feb, 5-12 Feb or even 29 Jan. None of those match the published notice, so ignore them. Chinese New Year Day itself is Saturday 6 Feb, which means the holiday opens on Friday 5 Feb (the Eve) and closes on Saturday 13 Feb, with Sunday 14 Feb a make-up working day. Two government calendars outside mainland China, Hong Kong and Singapore, independently put the New Year on 6 Feb as well.

Here is the structure of the break, day by day. Fri 5 Feb to Sat 13 Feb is the statutory holiday. Sun 31 Jan is a make-up working day before it, and Sun 14 Feb is a make-up working day after it. The first regular weekday back is Mon 15 Feb, though a factory that follows the state calendar can legally run on Sun 14 Feb.

9 days on the notice; up to six weeks of ripple on the factory floor.

China’s 2027 Statutory Holidays, in Days Horizontal bar chart of the three longest statutory holiday blocks in China in 2027, in days. Spring Festival 9 days (5-13 Feb), Labour Day 5 days (1-5 May), National Day 7 days (1-7 Oct). Spring Festival is the longest block, two days longer than National Day and almost twice Labour Day. China’s 2027 Statutory Holidays, in Days Length of the three longest holiday blocks in the State Council's 2027 notice. The darker bar is Spring Festival. Spring Festival (5-13 Feb) 9 days Labour Day (1-5 May) 5 days National Day (1-7 Oct) 7 days Source: State Council General Office of China, Notice on Arrangement of Certain Holidays in 2027 (issued 5 Nov 2026). Tier 1. Make-up working days not counted. Spring Festival make-up days: Sun 31 Jan and Sun 14 Feb.
Holiday Length Tier
Spring Festival (5-13 Feb)9 days1
Labour Day (1-5 May)5 days1
National Day (1-7 Oct)7 days1
Spring Festival is the longest 2027 holiday block at 9 days, ahead of National Day (7) and Labour Day (5). All three figures are Tier 1, from the State Council notice.
Metric Value Source Tier
Official Spring Festival 2027 holiday 5-13 Feb 2027 (Fri-Sat), 9 days State Council General Office of China 1
Make-up working days around the 2027 holiday Sun 31 Jan and Sun 14 Feb 2027 State Council General Office of China 1
Lunar New Year Day 2027 Sat 6 Feb 2027 (Eve is Fri 5 Feb) Hong Kong Observatory 1
Make-up working days across the whole 2027 holiday notice 5 days (2 of them around Spring Festival) State Council General Office of China 1
Labour Day 2027 holiday 1-5 May (5 days); make-up Sat 8 May State Council General Office of China 1
National Day 2027 holiday 1-7 Oct (7 days); make-up Sun 26 Sep and Sat 9 Oct State Council General Office of China 1
Hong Kong general holidays, Lunar New Year 2027 Sat 6 Feb, Mon 8 Feb, Tue 9 Feb (Sun 7 Feb is the second day) Hong Kong SAR Government (GovHK / 1823) 1
Singapore gazetted Chinese New Year 2027 (independent date check) Sat 6 Feb 2027; Mon 8 Feb substitute Singapore Government Gazette 1

Make-up Sundays mean a factory following the state calendar works Sun 31 Jan, so late-January output is not lost to the weekend. Factories set their own closing dates, so confirm yours in writing. Spring Festival is also the longest of the three 2027 blocks in the chart above; Labour Day (1-5 May) and National Day (1-7 Oct) are shorter, but they close factories too.

2. 2027 Versus 2026: Earlier Date, Same Length

The 2027 holiday arrives 11 days earlier on the calendar than 2026 (6 Feb against 17 Feb), and it is the same 9 days long. The date moved and the length did not, so for a small brand last year’s calendar minus 11 days is a sensible first draft.

Earlier also means less runway. From this article’s date, 13 Nov 2026, there are 84 days (12 weeks) to the holiday start on Fri 5 Feb (our arithmetic). Once the factory restarts on Sun 14 Feb, there are 76 clear days before Labour Day closes lines again on Sat 1 May. That spring window is the one most brands forget to plan for, and it is where post-holiday orders compete.

11 days earlier on the calendar, same 9-day length.

Metric Value Source Tier
Official Spring Festival 2026 holiday (last year) 15-23 Feb 2026, 9 days; make-up Sat 14 Feb and Sat 28 Feb State Council General Office of China 1
Shift in Lunar New Year Day, 2026 to 2027 11 days earlier on the calendar (17 Feb 2026 to 6 Feb 2027) NewWay derivation (derived): 17 Feb 2026 to 6 Feb 2027, same calendar date comparison: 17 - 6 = 11 days 2 (derived)
Time from this article’s date (13 Nov 2026) to the holiday start 84 days (12 weeks) to Fri 5 Feb 2027 NewWay derivation (derived): 13 Nov 2026 + 84 days = 5 Feb 2027 2 (derived)
Clear production window between the 2027 restart and Labour Day 76 days (Sun 14 Feb to Sat 1 May 2027) NewWay derivation (derived): 1 May 2027 minus 14 Feb 2027 = 76 days 2 (derived)

All rows marked derived are arithmetic on the two State Council notices and the Hong Kong Observatory table, with the formula shown in the Source column. The 76-day figure is the clear stretch before Labour Day closes factories again on 1 May.

3. Why the Real Disruption Outlasts the 9 Days

Maersk’s guidance is that factories cut output 2-3 weeks before the holiday and may not reach full capacity until mid-March, with logistics ripples lasting up to six weeks. Apply that pattern to 2027 and the slowdown window opens between Fri 15 Jan and Fri 22 Jan. Ramp-up to mid-March then runs about four weeks after the 14 Feb restart (also our derivation). The statutory 9 days are the smallest part of the problem.

Workers travel home before the holiday and return across the weeks after it, so output follows people, not the notice. We see this every year: the calendar says Monday, but a sewing line is only full when the last operator is back. How our factory-direct process works is built around that gap, with slack added to bulk runs that straddle the break.

Factories cut output 2-3 weeks before the holiday and may not be at full capacity until mid-March (Maersk).

Metric Value Source Tier
Factory output cut before the holiday, and return to full capacity Output typically reduced 2-3 weeks before the holiday; may not reach full capacity until mid-March Maersk 1
Length of the logistics ripple around the holiday Ripple effects begin much earlier and last up to six weeks Maersk 1
Expected 2027 slowdown start, applying Maersk’s 2-3 week pattern Fri 15 Jan to Fri 22 Jan 2027 NewWay derivation (derived): 5 Feb 2027 minus 21 days = 15 Jan; minus 14 days = 22 Jan 2 (derived)
Industry-reported total disruption, pre-holiday slowdown to full recovery Roughly 4-6 weeks SEKO Logistics (range repeated by DocShipper, Maersk and Inventory Hero) 3-consensus

Maersk’s figures describe a general pattern published for the 2026 cycle and are not specific to 2027, so the 2027 dates above are our derivation and are labelled that way. The 4-6 week range is a consensus across forwarder guides, not a measured national statistic. Treat it as a planning range.

4. The Workforce That Has to Come Back

China has 301.15 million migrant workers (NBS, 2025), and garment lines draw heavily on that pool. Each year it travels home and back across a record-setting transport system: 9.41 billion cross-regional trips over 40 days in 2026. A factory cannot restart on the date the notice allows. It restarts when enough of its sewers, knitters and QC staff are physically back.

Local authorities now charter transport and run job fairs to speed this up, which is why the restart gap is measured in weeks rather than months. In the 2025 cycle, about 370,000 workers returned on 15,000 chartered buses, trains and flights through 11 Feb, and the 2026 spring job drive listed 23 million vacancies through 32,000 job fairs. Those numbers show the size of the movement. They do not tell you what share of any one factory’s staff is back on a given day.

No official national return-rate figure exists for a normal year; the transport and vacancy numbers show the size of the movement, not the share of any one factory’s staff.

Metric Value Source Tier
China’s migrant worker population, 2025 301.15 million (+1.42 million, +0.5% year on year) National Bureau of Statistics of China 1
Average monthly income of migrant workers, 2025 5,075 yuan (+114 yuan, +2.3%) National Bureau of Statistics of China 1
Share of migrant workers aged 50 or older, 2024 (latest figure verified) 31.6% National Bureau of Statistics of China 1
Average age of migrant workers, 2024 (latest figure verified) 43.2 years National Bureau of Statistics of China 1
Cross-regional passenger trips, 2026 Spring Festival travel rush (40 days) 9.41 billion, a record China Ministry of Transport (relayed by Henan Provincial Government) 2
Peak single day of the 2026 travel rush (20 Feb 2026) 352.999 million trips (+12.3% on the same day of 2025) China Ministry of Transport (relayed by Henan Provincial Government) 2
Job vacancies posted after the 2026 Spring Festival 23 million vacancies through 32,000 job fairs China Daily (citing employment authorities) 2
Migrant workers returned to jobs on chartered transport, 2025 cycle About 370,000 workers on 15,000 chartered buses, trains and flights (through 11 Feb 2025) Xinhua / China Daily (Ministry of Human Resources and Social Security data) 2

The age and income rows give context on who these workers are: an older workforce (43.2 average age in 2024) earning 5,075 yuan a month in 2025. Transport, vacancy and charter figures are Tier 2 relays of ministry or state-media data from the 2026 and 2025 cycles. The 2024 age figures are the latest we verified; the 2025 NBS report exists and should replace them at the next update.

5. Working Backward From Your Delivery Date: Order Deadlines and Lead Times

Our own lead times are about 14 days for samples and 30 days for bulk after PP sign-off, a floor of 44 days from sample start to finished bulk for stock-fabric styles. Working backward from the 15 Jan slowdown start, the last sample start for a style that must finish before the holiday is Tue 1 Dec 2026. That is a floor with zero approval time, no fabric booking, no inspection and no freight.

Add the 4-week ocean booking guidance and the industry planning windows (standard orders Sep-Oct, production done late Nov-early Dec) and the honest answer is that new pre-CNY bulk with custom fabric is largely closed as of mid-November 2026. Stock-fabric styles are the exception. The alternative is to sign off the PP sample before 5 Feb and have bulk start at the restart. Our factory sits about 90 minutes from Ningbo port, which helps on freight timing, but it does not move the slowdown window.

Pre-holiday ship, stock fabric only: sample start by Tue 1 Dec 2026 at the very latest, in practice earlier.

Metric Value Source Tier
NewWay sample lead time About 14 days NewWay Industrial Co., Ltd. 1
NewWay bulk production time About 30 days after PP sample confirmation NewWay Industrial Co., Ltd. 1
Minimum sample-to-finished-bulk time for a stock-fabric style at NewWay 44 days (floor: no approval gaps, fabric booking, inspection or freight) NewWay derivation (derived): 14 + 30 = 44 days 2 (derived)
Latest sample start that still finishes stock-fabric bulk by Thu 14 Jan 2027 (the day before the slowdown window opens) Tue 1 Dec 2026 (floor; real deadline is earlier once approvals and freight are added) NewWay derivation (derived): 14 Jan 2027 minus 44 days = 1 Dec 2026 2 (derived)
Bulk clothing production lead time in China, industry range 30-90 days Shanghai Garment (Fumao Clothing) 3-consensus
Planning windows for CNY 2027 shipments (UK importer guide) Standard orders Sep-Oct 2026; production complete late Nov-early Dec; freight booked Dec 2026-Jan 2027 SEKO Logistics 3-consensus
Recommended ocean booking lead time before shipment At least 4 weeks SEKO Logistics (via The Loadstar) 3-consensus
Jiaxing to Ningbo port About 90 minutes by road NewWay Industrial Co., Ltd. 1

The dated checklist (derived)

Every date below is our arithmetic from the figures in the table above, not a NewWay commitment and not a published industry deadline. The first row is general practice with no sourced date.

By Step Basis Type
Fri 20 Nov 2026 Get your factory’s closing and restart dates in writing Derived
Tue 1 Dec 2026 Latest sample start for stock-fabric bulk to finish by Thu 14 Jan 2027 (floor) 14 Jan 2027 minus (14 + 30) days (NewWay ~14-day sample, ~30-day bulk) Derived
Thu 17 Dec 2026 Book ocean freight for cargo ready 14 Jan 14 Jan 2027 minus 28 days (SEKO/Loadstar at-least-4-weeks guidance (Tier 3-consensus)) Derived
Fri 15 - Fri 22 Jan 2027 Slowdown window opens 5 Feb minus 21 / 14 days (Maersk 2-3 weeks) Derived
Fri 5 - Sat 13 Feb 2027 Statutory holiday; Sun 14 Feb make-up day; Mon 15 Feb first regular weekday State Council notice Derived
Tue 16 Mar 2027 Earliest bulk completion if PP signed off before 5 Feb, ignoring ramp-up 14 Feb 2027 + 30 days (NewWay ~30-day bulk; Maersk mid-March capacity) Derived
Sat 1 May 2027 Labour Day (1-5 May) closes factories again State Council notice Derived

If PP is signed off before 5 Feb, earliest bulk completion is about Tue 16 Mar 2027 (14 Feb plus 30 days), before ramp-up delays. Maersk’s mid-March capacity point is consistent with that. For our own numbers, see the sample and bulk lead times at NewWay.

Category-specific lead times (knitwear against dresses against sportswear) and the cost premium for pre-CNY rush orders are not covered by any source we could verify. Every figure we found was a single supplier blog, so we left them out rather than guess. Ask your factory for its own dates in writing.

6. Small-Brand Order Sizes and Inspection: What MOQ Means for the Calendar

MOQ is counted per colour, not per style. A knitwear style in 3 colours is 900 pieces on stock yarn, while the same 3 colours in dresses is 300. More colours means a bigger single bulk run, and a bigger run is harder to squeeze into the weeks either side of the holiday. The cleaner CNY move for a small brand is fewer colours per style on the pre-holiday run and the rest after restart.

Inspection is the second pinch point. In our experience, rushed pre-holiday runs and short-staffed restarts are when defects slip through, so a second inspection at our own facility before packing matters most in this window. For how that works, see our inline quality control process. Custom-dyed fabric or yarn runs at 1,000 pieces and adds a dyeing stage to the front of the schedule, which is one more reason to keep colour counts low before the break.

Every extra colour on a knitwear style adds 300 pieces to the run.

Metric Value Source Tier
NewWay MOQ: dresses, sportswear, plus-size (stock fabric) 100 pcs per colour NewWay Industrial Co., Ltd. 1
NewWay MOQ: knitwear (stock yarn) 300 pcs per colour NewWay Industrial Co., Ltd. 1
NewWay MOQ: custom-dyed fabric or yarn 1,000 pcs NewWay Industrial Co., Ltd. 1
Minimum run for a 3-colour style 300 pcs in dresses/sportswear/plus-size; 900 pcs in stock-yarn knitwear NewWay derivation (derived): 3 colours x 100 = 300; 3 colours x 300 = 900 2 (derived)
NewWay inspection layers before shipment 2 (in-line inspection at partner factories, then a second inspection at NewWay’s facility before packing) NewWay Industrial Co., Ltd. 1
Jiaxing to Shanghai About 2 hours by road NewWay Industrial Co., Ltd. 1
NewWay annual exports $100M+ across 30+ countries NewWay Industrial Co., Ltd. 1
Supplier radius for yarn spinners, dye houses and trims Within 2 hours of Jiaxing NewWay Industrial Co., Ltd. 1

The MOQ rows, the two inspection layers and the distance and supplier-radius rows are NewWay first-party facts. They describe one factory in Jiaxing, Zhejiang, and are not industry benchmarks. The 100-per-colour figure applies to stock fabric.

Chinese New Year 2027 Production Calendar by the Numbers: 20 Key Data Points (2026)

Metric Value Source Tier
Official Spring Festival 2027 holiday 5-13 Feb 2027 (Fri-Sat), 9 days State Council General Office of China 1
Make-up working days around the 2027 holiday Sun 31 Jan and Sun 14 Feb 2027 State Council General Office of China 1
Lunar New Year Day 2027 Sat 6 Feb 2027 (Eve is Fri 5 Feb) Hong Kong Observatory 1
Make-up working days across the whole 2027 holiday notice 5 days (2 of them around Spring Festival) State Council General Office of China 1
Labour Day 2027 holiday 1-5 May (5 days); make-up Sat 8 May State Council General Office of China 1
National Day 2027 holiday 1-7 Oct (7 days); make-up Sun 26 Sep and Sat 9 Oct State Council General Office of China 1
Official Spring Festival 2026 holiday (last year) 15-23 Feb 2026, 9 days; make-up Sat 14 Feb and Sat 28 Feb State Council General Office of China 1
Shift in Lunar New Year Day, 2026 to 2027 11 days earlier on the calendar (17 Feb 2026 to 6 Feb 2027) NewWay derivation (derived): 17 Feb 2026 to 6 Feb 2027, same calendar date comparison: 17 - 6 = 11 days 2 (derived)
Time from this article’s date (13 Nov 2026) to the holiday start 84 days (12 weeks) to Fri 5 Feb 2027 NewWay derivation (derived): 13 Nov 2026 + 84 days = 5 Feb 2027 2 (derived)
Clear production window between the 2027 restart and Labour Day 76 days (Sun 14 Feb to Sat 1 May 2027) NewWay derivation (derived): 1 May 2027 minus 14 Feb 2027 = 76 days 2 (derived)
Factory output cut before the holiday, and return to full capacity Output typically reduced 2-3 weeks before the holiday; may not reach full capacity until mid-March Maersk 1
Length of the logistics ripple around the holiday Ripple effects begin much earlier and last up to six weeks Maersk 1
Expected 2027 slowdown start, applying Maersk’s 2-3 week pattern Fri 15 Jan to Fri 22 Jan 2027 NewWay derivation (derived): 5 Feb 2027 minus 21 days = 15 Jan; minus 14 days = 22 Jan 2 (derived)
Industry-reported total disruption, pre-holiday slowdown to full recovery Roughly 4-6 weeks SEKO Logistics (range repeated by DocShipper, Maersk and Inventory Hero) 3-consensus
China’s migrant worker population, 2025 301.15 million (+1.42 million, +0.5% year on year) National Bureau of Statistics of China 1
NewWay sample lead time About 14 days NewWay Industrial Co., Ltd. 1
NewWay bulk production time About 30 days after PP sample confirmation NewWay Industrial Co., Ltd. 1
Latest sample start that still finishes stock-fabric bulk by Thu 14 Jan 2027 (the day before the slowdown window opens) Tue 1 Dec 2026 (floor; real deadline is earlier once approvals and freight are added) NewWay derivation (derived): 14 Jan 2027 minus 44 days = 1 Dec 2026 2 (derived)
Recommended ocean booking lead time before shipment At least 4 weeks SEKO Logistics (via The Loadstar) 3-consensus
NewWay MOQ: knitwear (stock yarn) 300 pcs per colour NewWay Industrial Co., Ltd. 1

Methodology and Sources

This calendar uses 40 data points. 25 rows are Tier 1: the State Council’s 2027 and 2026 holiday notices, Hong Kong and Singapore government calendars, the Hong Kong Observatory table, Maersk, the National Bureau of Statistics of China, and NewWay’s own company facts. 11 rows are Tier 2: four relays of Chinese ministry and state-media data plus 7 derived rows (arithmetic from stated inputs, formula shown, labelled derived and tagged Tier 2). 4 rows are Tier 3-consensus (forwarder and manufacturer guides whose ranges agree across several independent sources); no Tier 3-flagged figure is used. Lead times are industry-reported ranges, not measured national statistics. We did not use dates from guides that conflict with the State Council notice.

Rows marked derived are our own arithmetic from the stated inputs, with the formula shown beside each one. NewWay’s lead times, MOQs, inspection process and distances are our own published operating terms. They describe one factory in Jiaxing, Zhejiang, and are not industry benchmarks.

Recency notes

  • The State Council 2027 holiday notice was issued on 5 Nov 2026; holiday dates are official, not expected.
  • Maersk’s slowdown and mid-March capacity guidance was published for the 2026 cycle (Nov 2025) and describes a general pattern; 2027 dates built on it are derived.
  • Migrant worker age figures are from the 2024 NBS report (latest verified); the 2025 report exists and should replace them at the next update.
  • Travel-rush, vacancy and charter figures are from the 2026 and 2025 cycles, not 2027.
  • SEKO UK planning windows (Sep-Oct standard orders) are written for UK importers and are general practice, not NewWay dates.
  • Today’s date is mid-November 2026; some pre-CNY order windows quoted by forwarders have already passed.
Full source list – 18 documents

Last updated: November 2026. We update this page quarterly.

Planning a Spring 2027 Run Around the Holiday?

NewWay makes sweaters, dresses, sportswear and plus-size in Jiaxing, Zhejiang: 100 pieces per colour on stock fabric, 300 per colour on stock yarn, about 14 days to sample and 30 days of bulk after approval, FOB Ningbo or Shanghai. Send us your styles and colour count and we will give you real dates around the 5-13 Feb closure before you commit.

Talk to the Factory →